Clinton Reservoir Water Treatment Plant

Executive Summary 2009

2101 Wakarusa Drive

Description: Buildings and above ground structures’ exteriors are brick. Administration building interior is sheetrock, block, and metal. All other buildings’ interiors are glazed or painted block. Above and below ground structures are concrete. Facility includes 5 buildings, 2 above ground structures, and 6 below ground structures, as well as miscellaneous underground piping and equipment.

Year Constructed: 1980

Current Insured Value: $16,879,000

Condition Report: The water treatment plant structures are in very good overall condition. General maintenance of all buildings and structures is required on a regular basis.

Completed Improvements: The original structures of the water treatment facility were constructed in 1980. Maintenance and improvements are planned and completed on the facility on an on-going basis. However, the following major improvements were completed in recent years:

2001

  • Added 4 more filters and replaced the intake pumps at Clinton dam with energy efficient pumps.

2009

  • Added a second train of basins, replaced various equipment with more efficient models and systems, replaced the high service pumps with energy efficient pumps.

Energy Conservation Efforts

  • Replaced boiler for more efficient heating of main building

Needed Improvements
(With the completion of Phase I & II construction, there are limited other improvements needed at this time.)

Needed Energy Efficiency Projects
(With the completion of Phase I & II construction, there are limited other improvements needed at this time.)

Energy Costs History

 

2007

2008

Gas

$14,713

$5,643

Gallons water treated per cu. ft.

1534

1937

Electric

$245,294

$261,286

Gallons water treated per kw

617

549

Heating degree days

NA

NA

Cooling degree days

NA

NA

Note: Most of the electricity and gas is used for the operation of the plant, including the pumps, motors, blowers, and other equipment that is used in the treatment of water. Only a small percentage of these costs are related to lighting, temperature control, and other office uses.

Energy Consumption

Natural Gas Usage

 

January

February

March

April

May

June

July

August

September

October

November

December

2007

2061

2327

1549

1537

1220

1032

69

11

12

66

1306

2845

2008

1211

3391

543

58

166

63

13

47

137

821

656

3082

 

Electricity Usage

 

January

February

March

April

May

June

July

August

September

October

November

December

2007

281280

278112

173416

268504

277036

283844

321800

401020

359056

322024

278860

347660

2008

286072

241216

281976

288694

281280

318984

350632

392448

446560

332680

267920

302712