Investigations and Training Center

Due to the ongoing winter storm, City facilities, including City Hall and all Parks, Recreation and Culture facilities, will be closed on Tuesday, Feb. 18. This is due to the forecasted winter storm resulting in dangerous travel conditions.

Read the news release for full details >>

ITC

Executive Summary 2009

4820 Bob Billings Parkway

Description: Exterior is brick. Interior is sheetrock and metal studs. 39,000 total sq. ft. East side upper level is currently unoccupied and is used for PD storage and training exercises and consists of 7,000 sq. ft.

Year Constructed: 1988

Current Appraised Value:

  Land Improvements Total
4820-A $249,370 1,374,030 1,623,400
4820-B $506,860 1,151,040 1,657,900

Condition Report: Building is in good overall condition. There are periodic small leaks in the roof. The roof is still under warranty.

Completed Improvements

2000

  • Roof replacement. Roof has a 20 yr warranty.
  • Lower level remodel

2001

  • DEU rooftop replacement
  • New rooftop for upper level west side

2003

  • Electric VAV reheat boxes installed upper, level west side
  • New DDC controls installed in the upper level, west side

2004

  • DDC controls installed lower level west side

2005

  • Rooftop unit replaced for south side, upper level unoccupied space

Energy Conservation Efforts

  • Replacing roof top units, incorporated variable speed drives, multi-phase project, 1999-current
  • Installed DDC controls, upper and lower levels
  • Installed electric reheat boxes on the upper level allowing for zone temperature control
  • Installed ductless split air conditioners in the computer forensic lab
  • Installing fluorescent lights and upgrading ballasts as current lighting fails

Needed Improvements

  • Renovation of current vacant side
  • West patrol offices
  • Expansion of current side
  • West patrol offices and Admin. expansion
  • Additional locker rooms
  • Exterior tuck pointing / caulk replacement
  • Exterior brick / tile replacement
  • Faulty Window Replacement
  • Roof Edge Cap replacement
  • Replacement / Upgrade of Air Handling Units
  • Expansion of Building Security System including Audio/Video
  • Concrete replacement (front entry)
  • Parking Lot expansion
  • Parking Lot overlay
  • Removal of existing (de-commissioned) HVAC RTU’s
  • In Ground Sprinkler System for areas close to building

Needed Energy Efficiency Projects

  • Replacement of Low Efficiency Windows
  • Installation of Window Canopies on west windows
  • Replacement/Upgrade of Air Handling Units
  • Complete installation of VAV duct heaters

Energy Costs History

 

2007

2008

Gas

$6,943.80

$9965.19

Sq. ft.

.18

    .25

Electric

$36,452.65

$45,263.59

Sq. ft.

      .93

1.16

Heating degree days

6949

5770

Cooling degree days

1701

1173

 

 

 

 

 

 

 

 

Natural Gas Usage

 

Jan

Feb

Mar

April

May

June

July

August

Sept

Oct

Nov

Dec

2007

481

1464

471

492

127

112

105

113

130

235

112

1823

2008

1969

2115

1225

772

302

96

104

51

157

328

708

1710

Electricity Usage

 

Jan

Feb

March

April

May

June

July

Aug

Sept

Oct

Nov

Dec

2007

51200

52400

47800

43600

55200

67800

61800

77600

61200

50000

58600

59400

2008

56200

53000

51600

52000

55200

67400

77800

64600

55600

47800

58200

66200