2024 Street Maintenance Program
The City Commission adopted a budget of approximately $9,123,000 to be utilized for the 2024 Street Maintenance Program (MS6-M24000). Contracted milling, patching, micro surfacing (pavement surface seal), asphalt overlay, and concrete rehabilitation maintenance are planned for 2024 as reflected on the interactive program map.
Staff has also completed a five year street maintenance plan including 2025 through 2028. The planned future street maintenance program is based on adopted 2024-2028 Capital Improvement Plan funding levels. 2024 = $9,123,000 2025 = $9,660,000 2026 = $10,960,000 2027 = $12,417,000 2028 = $13,425,000
The Street Maintenance Program consults the Bikeway Map to determine if on-street bike facilities should be included with a project. The bike plan strives for a level of comfort of 3 or below, but there are times when the preferred bikeway separation is not feasible due to the scope of the maintenance project. The improvements proposed are based on the street width and funding constraints. Some streets in the plan include sharrows or have existing bike facilities that will be reestablished.